Building Inspection (Yapı Denetim) in Turkey: A Guide for Homeowners
What does the yapı denetim company check between the building permit and iskân, and what does it leave out? How it relates to the architect and builder, and what you should keep track of as the owner.
Architect Okan Çakal

Owners building in Turkey for the first time often meet the words yapı denetim on the permit paperwork and assume one of two things: either it is a formality, or it is someone who will check everything about the house on their behalf. Neither is quite right. Building inspection is a serious, legally required system for buildings that need a permit, but its scope is specific, and it is not your representative. Here we explain from our experience on site what it does, what it does not do, and what you should keep track of yourself, particularly if you spend part of the year abroad. Regulations change from time to time, so this is the general framework; confirm the details for your project with the municipality.
1. What is yapı denetim?
In Turkey, the design and construction of buildings that require a building permit (yapı ruhsatı) are inspected by building inspection companies authorised by the Ministry. It is not the municipality itself: the company has its own inspecting architects and engineers, plus site inspectors. Its job is to check that the building is built in line with the approved projects, standards and regulations.
How the company is assigned and how its fee is calculated and paid are set by regulation, and the rules have changed over the years. Ask the municipality or the relevant authority about the current procedure before applying for the permit; we do not go into those details here.
2. Before the permit: checking the projects
The inspection starts at the desk, not on site. A contract with the inspection company is signed before the permit application, and the company reviews the projects the permit will be based on:
- Architectural, structural, electrical and mechanical projects
- The soil survey report, and whether the foundation design matches it
- Whether the projects agree with each other and with the regulations
Anything that does not comply is sent back for correction. If the projects contradict each other, the file returns at this stage, which is why having one team coordinate them saves time. The permit steps as a whole are covered in our article on building permits and iskân.
3. During construction: what is checked on site
Once building starts, the company checks the critical stages against the projects on site. In general:
- Excavation and foundations: the ground against the soil report, the foundations against the drawings
- Formwork and reinforcement: bar sizes, spacing and placement, before any concrete is poured
- Concrete: samples taken during the pour and strength-tested in a laboratory
- Reinforcing steel: samples tested
- Other stages: walls, roof, insulation and services against the projects
Stages are recorded in signed reports. If the company finds work that departs from the approved projects, it asks for it to be corrected, and reporting uncorrected breaches to the authorities is part of its duty. What is checked at each stage is set out in detail in our article on stage-by-stage construction checks.
4. The last step before iskân
When the building is completed in line with its approved projects, the inspection company carries out its completion procedure, and its documentation is required for the iskân (occupancy permit, yapı kullanma izin belgesi) application. Unapproved changes during construction cause trouble at exactly this point, so on our sites every "small change" idea is checked against the project, and against the permit where needed, before it is built.
5. What building inspection does not cover
Building inspection checks compliance, not good design. The following are generally outside its scope:
- Whether the plan works, which way the rooms face, views and daylight
- The finish quality you see: aligned tile joints, clean paintwork, doors and cupboards properly adjusted
- Interior design, material choices and the material grade written into your contract
- Your contract with the builder: scope, price, payment terms and work programme
- Interior renovations that do not need a permit
Building inspection checks whether the house is built to its project; it does not check whether the project is any good.
That gap is filled by an architect who stands behind the design during construction and by a contract that defines the scope item by item.
6. Architect, builder and inspector: who is responsible for what?
On a permitted building the roles are separate:
- Project authors: the architect and engineers who prepare the projects; the architect also owns the design decisions and the coordination between projects.
- Builder and site manager: carry out the work, run the site day to day and are responsible for following the projects.
- Building inspection company: carries out the independent inspection required by law.
- You, as the owner: make the decisions, sign the contracts and make the payments.
In the way we work, the architect who draws the project also runs the site, so keeping the design, materials and details intact is one point of contact's responsibility. The inspection company's stage checks do not replace this; they complement it. Who handles the permit and inspection procedures should be written into the contract, as we explain in our article on turnkey construction contracts.

7. What to keep track of as the owner
You do not need to be on site every day, but it is worth knowing the answers to these questions:
- Which inspection company is named in the contract, and how can you reach the inspector?
- When were the concrete pours, and was the reinforcement checked before each one?
- When did the concrete and steel test results come back?
- Are the stage reports being kept up to date?
- If the approved project needs to change, is the revision and permit process followed first?
- Who will follow up the completion and iskân procedure?
These are normal questions to ask; on a well-run, well-documented site the answers are ready.
How we run design and construction with one team in Fethiye, in step with the inspection process, is explained on our construction in Fethiye page.
Frequently asked questions
Is building inspection compulsory for every house?
As a general rule, a building that needs a permit cannot get one without a building inspection contract. Exceptions are defined in the regulations, so confirm your project's situation with the municipality.
Does yapı denetim protect me if I buy a new-build from a developer?
It checks that the building is built to the approved projects and regulations. It does not check your sales contract, payment terms or whether the finishes match what was promised; for the purchase itself, take independent legal advice and check the title deed (tapu) and iskân status.
Can the inspection company act for me while I'm abroad?
No. It is an independent inspector working under the law, not your representative. Your interests on design, scope and quality are protected by a clear written contract, payments tied to completed stages and an architect who runs the site.
Does a renovation need building inspection?
Interior renovations that do not touch the structure, the façade or shared areas usually do not need a permit, so no inspection process arises. For changes that do need a permit, confirm the procedure with the municipality.
If you are planning to build a house or villa in Fethiye, get in touch and we will plan the permit, inspection and work programme together from the start.