Winter renovation in Fethiye: planning your refurbishment before the season
Own a holiday let or summer home in Fethiye? Why renovations should be planned in autumn, how to build the schedule back from handover, and a pre-season checklist.
Architect Okan Çakal

If you let your villa in Ovacık or Hisarönü to holiday guests, or use your apartment in Çalış only in summer, the timing of a renovation matters as much as the work itself. A half-finished bathroom when the season opens means cancelled bookings, or your own holiday spent on a building site. So we give owners the same advice every year: plan the refurbishment in autumn, carry it out in winter. Here is how we plan a winter renovation, from our experience on site.
Why autumn and winter?
In Fethiye, summer is when homes are used most and when building work is hardest. Once the season ends, the house empties, there are no guests and fewer neighbours around. The advantages of renovating then:
- The house is empty: work moves from room to room without waiting for anyone
- No lost bookings: a holiday let does not lose income
- Time to plan: decisions are not rushed
- Ready for the season: the house is cleaned and tested before the first guest arrives
Winter work has its own conditions, though: rain, humidity and short days. A good plan allows for them from the start.
Build the schedule backwards from handover
In a winter renovation, the schedule is drawn back from the day the first guests arrive, not forward from the start.
For a holiday let, the fixed date is the first booking of the season. We build the schedule backwards from it:
- Handover and preparation: cleaning, furnishing, final checks
- Installation and finishes: fitting custom joinery, painting, taps and fittings
- Main works: strip-out, plumbing and electrics, flooring and tiling
- Ordering and manufacture: custom-made items and materials with long lead times
- Design and approval: 3D visuals, material selection, an itemised quote and work schedule
How long each stage takes depends on the scope, so we fix the actual dates after a site survey, in a work schedule with a start and finish date. What matters is leaving some slack between stages and before handover.
Decisions to make early
The most common reason winter renovations slip is late decisions. We recommend settling these before work begins:
- Design: layout, colours and materials approved on 3D visuals
- Long-lead materials: some tiles, fittings, windows and doors or imported products have to be ordered well ahead
- Custom joinery: kitchens, wardrobes and bathroom units are made after measuring, and manufacturing time is a real part of the schedule
- Scope: a written list of what will and will not be done
You can still change your mind once work starts, but in a winter renovation every late decision puts pressure on the handover date.

Weather-sensitive work
Not every job is equally easy in winter. External painting, roof and terrace waterproofing, work around the pool and outdoor paving all need dry weather. We keep these flexible in the schedule and switch to indoor work on rainy days. Humidity can also slow the drying of plaster and paint, so ventilation and, where needed, heating are part of the plan.
Winter is also a chance to find problems that do not show in summer: a window that lets in rain or a terrace that leaks shows itself with the first storms.
If you are away during the work
Many owners who use or let their Fethiye home in summer spend the winter elsewhere. What helps is having every decision made in writing and on visuals before work starts:
- Approval based on 3D visuals and a material schedule
- A contract that sets out scope, specification level, work schedule and payment stages line by line
- The architect who designed the work also runs the site, so you have one point of contact
Instead of dealing with several tradespeople separately, you have one person to ask. Our website is available in three languages.
Checklist before guests arrive
Before handover, and before the first guest checks in, we go through:
- Water flow and leak checks on every tap, shower and drain
- Testing electrics, lighting and sockets
- Running the air conditioning and hot water system
- Checking doors, windows and locks
- Starting up the pool and garden irrigation
- A thorough post-construction clean
- Closing out the snagging list
We cover material choices for holiday lets in our guide to designing a rental villa that lasts the season, and what drives renovation costs in our article on renovation prices in Fethiye. Any questions about rental licences or tax for holiday lets should be confirmed with an accountant or the relevant authority.
If you are thinking of renovating this winter, starting early is the biggest advantage you can give yourself. Get in touch with us and we will survey the property and prepare a work schedule around your handover date. More details are on our Renovation & Refurbishment page.
How we run pre-season renovations to a dated programme is covered on our renovation in Fethiye page.
Frequently asked questions
When should I start talking to a contractor about a winter renovation?
As soon as the season ends, or ideally during it. The earlier the survey, design and custom orders begin, the more comfortably the works fit into the winter months.
Will the renovation be finished before the season?
That depends on the scope and on when decisions are made. We build the schedule back from your first booking and fix it in a work schedule with start and finish dates.
Can the renovation go ahead while I am out of the country?
Yes. When decisions are approved on 3D visuals before work starts, the contract is itemised and one architect runs the site, most of the work does not need you to be there.