EOSA İnşaat Mimarlık

Services

Renovation

Full renovation of flats, villas and commercial spaces, kitchens and bathrooms, and all services — site survey, itemised quote, one team, architect supervision.

The hard part of a renovation is usually the part you cannot see: pipes inside the walls, insulation under the floor, unplanned changes made over the years. A price or a schedule given without seeing these will change on site. That is why every job starts with a site survey.

From full renovation of a flat or villa to refreshing a single room, we do the whole job with one team under the architect's supervision. You don't have to find separate tradespeople, coordinate them, or hear "that's not my job".

What we renovate

  • Full flat and villa renovation: from reorganising the layout to the final coat of paint
  • Kitchens: services, worktops, custom cabinets and appliance layout
  • Bathrooms: strip-out, waterproofing, tiling, sanitaryware and fittings
  • Services: electrics, plumbing, flooring, plaster, paint
  • Commercial spaces: offices, clinics and shops adapted to new needs

Why kitchens and bathrooms need extra care

Kitchens and bathrooms need the most infrastructure. Because strip-out, plumbing, waterproofing, tiling, sanitaryware and custom cabinets are done by the same team, trades don't wait for each other. Hidden layers such as waterproofing are the ones that cost most if done wrong, so we never skip or rush them. You see your new kitchen or bathroom in 3D first and choose materials with us.

Process

  1. Survey: we see the space and assess your needs and the current condition.
  2. Design: you see the new space in 3D and choose materials and colours.
  3. Quote: an itemised written quote and a schedule with start and end dates.
  4. Services: strip-out, electrics, plumbing and waterproofing.
  5. Finishes: flooring, tiling, paint, custom furniture and installation.
  6. Handover: final checks together and a clean space.

What determines the price?

We give the exact price, item by item, after the site survey. The main factors are the size of the area and amount of strip-out, whether electrics and plumbing are renewed, the class of materials, the amount of custom joinery and the timing (whether the home is empty, whether it must be ready before the season).

Every item is shown separately in the quote, so you know from the start what you pay for.

Holiday lets and the season

Renovations of villas and flats let in Fethiye must finish before the season opens. We plan the work in winter and build the schedule around your handover date, recommending durable, easy-to-clean, low-maintenance materials.

Selected renovation projects

More on renovation in Fethiye: Renovation in Fethiye.

Frequently asked questions

How long does a renovation take?

It depends on the scope: a single bathroom and a full flat are very different. After the survey we give a schedule with start and end dates.

Do I need a permit?

Interior works that don't touch the structure, façade or use of the building usually don't need a permit. Structural or façade changes do; in apartment buildings, management rules also apply. We assess this during the survey.

Can I live in the home during the works?

Depending on the scope, work can be phased room by room. Kitchens and bathrooms may involve short interruptions, which we state in the schedule in advance.

Renovation
← All services

Contact

Let's talk about your project.

Call us or fill in the form for a site visit and a quote; we will get back to you shortly.